Rail, Infrastructure, Public works
BACKGROUND
As a key asset in energy and green transition, the rail sector is developing and must offer outstanding service quality while controlling its roll-out and maintenance costs.
In France, passenger rail traffic has more than doubled since 1950.
In less than 40 years, France has built 2,700 km of high-speed lines.
THE CHALLENGES
X 2,5
450
200 KM
2030
ABYLSEN’S
SECTORS OF INTERVENTION
- Projet Management Support
- Design management engineering: Implementation / Feasibility / Works management / Supervision
- Process optimisation
- Equipment (railway tracks, overhead lines, telecom, signalling, etc.)
- Technical specifications
- Design and integration studies
- Product testing & certification
- Driving automation / Signalling / Telecommunications
- Product / After-sales service
- Industrialisation & Production
- Methods: assembly task lists, integration
- Quality
- Validation & Approval: testing, site/factory trials, installation
- Planning
- Study completion guidance
- Technical coordination
- Team management
- Doc control / Contract management
nos expertises métiers EN
Chez Abylsen, nous avançons avec passion et efficacité pour développer des solutions ingénieuses et répondre aux enjeux et performances opérationnelles de nos clients.
Rejoignez l'aventure EN
Nous sommes sans cesse à la recherche des meilleurs talents afin de renforcer nos Expertises métiers. Évoluer au sein du Groupe Abylsen, c’est bénéficier d’un cadre mouvant et responsabilisant pour chacun. Cette liberté, c’est la garantie pour chaque collaborateur de donner le meilleur de lui-même et de s’épanouir dans ses projets, sa carrière et son équipe.
Vous souhaitez rejoindre l’aventure Abylsen ?